hirly

Apply with hirly

Deputy Manager

KP Group · surat, India

Upload your resume to see how well you match this job — free, in seconds, no account needed.

Your resume is used only to score it against this job. If you don't create an account, it is deleted within 24 hours.

Job Description (JD) Title: SCADA Execution Head – Solar/Wind/Substation Projects Location: Site Based- (Base Location: Bharuch, need to travel-

Pan India

as per Business requirement) Industry: Renewable Energy – Solar/Wind Experience: 10–20 Years Role Overview: Experienced SCADA Execution Head to lead end-to-end SCADA/PPC/SAS/Telemetry system execution for large-scale solar projects connected to STU & CTU substations . The candidate will be responsible for design coordination, execution, testing, commissioning, and compliance with grid connectivity requirements. Key Responsibilities:

  • Lead complete SCADA/PPC/SAS/Telemetry system execution for utility-scale solar projects connected to State Transmission Utility (STU) / Central Transmission Utility of India Limited (CTUL) substations.
  • Ensure compliance with Central Electricity Authority (CEA) regulations and grid connectivity standards.
  • Coordinate with SLDC/RLDC/NLDC for telemetry, real-time data integration, and grid synchronization approvals.
  • Manage SCADA architecture including:
  • Data loggers
  • RTUs
  • PPC (Power Plant Controller)
  • Weather monitoring systems
  • String/central inverter communication
  • Interface with OEMs, EPC teams, protection & control teams, and STU/CTU substation authorities.
  • Ensure proper integration with SAS (Substation Automation System).
  • Lead FAT, SAT, and end-to-end commissioning activities.
  • Review communication protocols (IEC 60870-5-104, Modbus, OPC, IEC 61850).
  • Ensure cybersecurity compliance as per grid requirements.
  • Monitor project timelines, resource allocation, and execution quality.
  • Handle troubleshooting during commissioning and post-synchronization.
  • Prepare documentation including:
  • SLD inputs
  • Communication architecture drawings
  • Telemetry point list
  • Approval documents Technical Requirements:
  • Strong knowledge of:
  • STU/CTU connectivity procedures
  • SCADA & PPC integration
  • Grid code compliance
  • SAS systems
  • Experience in projects connected to ISTS network.
  • Hands-on experience in telemetry approval from RLDC.
  • Knowledge of protection relay integration & disturbance recorder data.
  • Familiarity with remote monitoring platforms and cybersecurity frameworks. Qualification:
  • B.E./B.Tech in Electrical / Electronics / Instrumentation Engineering.
  • Minimum 10+ years of experience in Solar/Wind SCADA execution.
  • Experience handling ≥100 MW utility-scale projects preferred. Leadership & Soft Skills:
  • Team Leader
  • Strong stakeholder management skills.
  • Ability to coordinate with STU, CTU, RLDC, OEMs, and EPC partners.
  • Excellent problem-solving and decision-making ability.
  • Willingness to travel and work at project sites. Preferred Experience:
  • Experience in large ISTS-connected solar parks.
  • Prior experience in SCADA integration at 220kV / 400kV substations.
  • Exposure to hybrid (Solar + BESS) projects will be an added advantage.